Project Information

Comprehensive details for the Noosa Heads post-construction cleaning project.

88-DAY JOB: QUALIFIES FOR YOUR SECOND-YEAR VISA
This project can be counted towards the 88 days of specified work for those on a Working Holiday Visa (subclass 417 or 462) in Australia.
Key Information
Quick access to important project details organized by phase.

Project Overview

This project involves the complete post-construction cleaning of a new luxury residential complex in Noosa Heads. The goal is to ensure the property is pristine, safe, and ready for homeowner occupancy. Attention to detail is paramount.

Location

14-16 Hastings Street, Noosa Heads

Vehicular entrance off Noosa Parade

QLD 4567, Australia

Tel: +61754494888

View on Map
Scope of Work
  • Initial debris and dust removal from all surfaces.
  • Detailed cleaning of windows, frames, and sills (interior and exterior where accessible).
  • Floor cleaning, including scrubbing, polishing, and sealing of various surfaces (tile, concrete, wood).
  • Deep cleaning of kitchens and bathrooms, including all fixtures and appliances.
  • Cleaning of all cabinetry, closets, and storage areas, inside and out.
  • Final touch-ups and preparation for client handover.
Project Schedule

Start Date

September 2025

Duration

3 to 4 months

Working Hours

Dayshift

  • Monday - Friday: 6:00am till finish
  • Saturday: As required
Payment Information
Payment is fixed per room clean. The time estimates are indicative; additional time for corrections is not paid extra.

There are 162 rooms, and each room requires two separate cleaning phases: an Initial Clean and a Final Clean. Each phase is paid at a fixed rate.

Cleaning PhasePayment per RoomEst. Time
Initial Clean$105~3.25 hours
Final Clean$105~3.25 hours

Daily Work Example

Cleaners are expected to complete 3 cleans (either initial or final) per day.

Example: 3 Initial Cleans = $315 for a ~9.75-hour day.

Safety Protocols
  • All cleaners must wear appropriate PPE at all times (hard hats, high-vis vests, steel-toed boots).
  • Safety data sheets (SDS) for all cleaning chemicals must be available on-site.
  • Emergency contact information and first-aid kits must be clearly accessible.
  • Regular safety briefings will be held at the start of each day.
Using Body Cameras on the Job

For this project, every cleaner will use a body camera. This is an important step we're taking to protect you and to document our work.

The camera serves as a witness, protecting you from any false claims and showing that our team completed the job to a high standard.

We will use the Alfred Camera app.

Please install the app on your phone by this links below:

Meet the Team
J

John Doe

Project Manager

J

Jane Smith

Lead Cleaner

M

Mike Johnson

Safety Officer

Riviera Wing

time for initial cleanfinal cleantotal time including initial and final cleanRoom Typenumber of roomsapprox m2
Level 6
6.16.112.2x1 Opera Suite184
8.58.517.0x1 Junior Suite1117
3.33.36.7x12 417 Full Reno1246
3.33.36.7x5 416 Full Reno546
21.221.242.519 Rooms Total
Level 5
6.16.112.2x1 Opera Suite184
3.33.36.7x12 417 Full Reno1246
3.33.36.7x5 416 Full Reno546
8.58.517.0x1 Junior Suite1117
21.221.242.519 Rooms Total
Level 4
6.16.112.2x1 Opera Suite184
8.58.517.0x1 Junior Suite1117
3.33.36.7x11 417 Full Reno1146
3.33.36.7x6 416 Full Reno646
21.221.242.519 Rooms Total
Level 3
6.16.112.2x1 Opera Suite184
8.58.517.0x1 Junior Suite1117
3.33.36.7x4 417 Full Reno446
3.33.36.7x3 416 Full Reno346
3.33.36.7x9 416 Light Touch946
24.624.649.218 Rooms Total
Level 2
8.58.517.0x1 Junior Suite1117
3.33.36.7x6 416 Full Reno646
3.33.36.7x7 416 Light Touch546
15.215.230.314 Rooms Total
Level 1
3.33.36.7x5 416 Light Touch546
9.49.418.9x1 136-138 Apartment (416 Full Demo)1130
12.812.825.56 Rooms Total

Conference Wing

time for initial cleanfinal cleantotal time including initial and final cleanRoom Typenumber of roomsapprox m2
Level 6
5.45.410.9x1 Prestige suite175
7.07.013.9x1 Hero suite (Lunch Room)196
8.58.517.0x1 Junior Suite1117
30.03.360.0x9 417 Full Reno946
10.03.320.0x3 416 Full Reno346
60.927.6121.815 Rooms Total
Level 5
5.45.410.9x1 Prestige Suite175
0.08.50.0x1 Junior suite (excluded)0117
16.73.333.4x4 417 Full Reno546
16.73.333.4x5 416 Full Reno546
16.73.333.4x5 416 Light Touch546
55.523.9110.916 Rooms Total
Level 4
10.95.421.8x2 Prestige Suite275
6.83.413.6x1 Disabled Suite247
8.58.517.0x1 Junior Suite1117
10.03.320.0x4 417 Full Reno346
20.03.340.0x6 416 Full Reno646
16.73.333.4x5 416 Light Touch546
72.927.3145.719 Rooms Total
Level 3
10.95.421.8x2 Prestige Suite275
8.58.517.0x1 Junior Suite1117
32.54.665.0x7 Wellness Suites764
23.33.346.7x7 417 Full Reno746
6.73.313.3x2 416 Light Touch246
81.925.2163.719 Rooms Total

Unique Room Types

  • x1 Opera Suite
  • x1 Junior Suite
  • x12 417 Full Reno
  • x5 416 Full Reno
  • x11 417 Full Reno
  • x6 416 Full Reno
  • x4 417 Full Reno
  • x3 416 Full Reno
  • x9 416 Light Touch
  • x7 416 Light Touch
  • x1 136-138 Apartment (416 Full Demo)
  • x1 Prestige suite
  • x1 Hero suite (Lunch Room)
  • x9 417 Full Reno
  • x1 Junior suite (excluded)
  • x4 417 Full Reno
  • x2 Prestige Suite
  • x1 Disabled Suite
  • x7 Wellness Suites
  • x7 417 Full Reno
  • x2 416 Light Touch